JRPassBestel uw JRPass
Terug naar Using the Japan Rail Pass

Torn physical exchange order

Juliating23
Juliating23
meer dan 2 jaar geleden
2 antwoorden

Hello I have bought a physical exchange order for JR pass but accidentally torn it a little bit at the right side, where the barcode is . I am wondering if this is still valid to be exchanged with a JR pass? Thanks

avatar
Daniel-san
19375 post
meer dan 2 jaar geleden
Expert

Hi there,

A little bit of damage won't be a problem, as long as all the details are readable.

Please contact our support team, in case you do need a re-issue.

Kind regards,
Daniel

Juliating23
Juliating23
2 post
meer dan 2 jaar geleden

Hi Daniel thanks so much. I just saw this message and already in Japan. They do accept my torn JR exchange voucher. :)


Op zoek naar meer informatie? Doorzoek het forum

selecteer categorie

Bestel hier

Vanaf $353,00 voor 7 dagen onbeperkt reizen met Japan Rail

Antwoord niet gevonden?

Leer van meer dan 19202 vragen over de Japan Rail Pass of stel een vraag aan onze reisspecialisten.

Stel een vraag

Bestel Pocket WiFi in Japan

Bestel Pocket WiFi in Japan

Bezoek onze Facebook pagina

Raak geïnspireerd voor je bezoek aan Japan door ons te volgen op Instagram en vergeet je eigen foto's niet met ons te delen als je er eenmaal bent.


Ontdek waar u de treinpas van Japan online kunt kopen.

Bestel uw JRPass nu!

We hebben speciale prijzen voor kinderen en geweldige 1ste klas opties. Bekijk alle tickets. Of bekijk ons aanbod Regionale passen